 |
 |
Notes regarding the resources section | Close box |
|
Thankyou for using the resources section, inside you will find brochures, presentations, images and trade show/exhibiton resources etc.
If you require support of a technical nature such as product manuals, drivers and firmware, please use MyKingfisher http://www.rtunet.com/support
|
|
DocumentsDate added
-
Advance Energy - SCADA system upgradehot!
-
19.09.2006
-
See how Kingfisher RTUs help lower Total Cost of Ownership for Advance Energy
-
Hits: 1170
-
-
ILS Monitoring System - Melbourne Airporthot!
-
19.09.2006
-
Read how Kingfisher RTUs monitor ILS navigation and landing systems at Melbourne Airport.
-
Hits: 1213
-
-
Electricity substation monitoringhot!
-
19.09.2006
-
Redundant monitoring and control of control relays and the main transformer at the new Balranald Substation being constructed for Transgrid.
-
Hits: 746
-
-
Water distributionhot!
-
19.09.2006
-
Monitoring Water distribution system
-
Hits: 1661
-
-
Communications Redundancyhot!
-
19.09.2006
-
One of Kingfisher RTUs strongest features is it's ability to handle multiple communication modes & paths with ease. Communication redundancy is essential for mission-critical applications.
-
Hits: 583
-
-
DNP3 Protocolhot!
-
19.09.2006
-
See how DNP3 is implemented in Kingfisher RTUs
-
Hits: 704
-
-
Dolphin Energyhot!
-
19.09.2006
-
Dolphin Energy is responsible for supplying natural gas from Al Ain (United Arab Emirates) to the water desalination plant in Fujairah, a total distance of 210 Km. Our scope of supply was to provide
redundant Kingfisher RTUs for each of the 8 block valve stations along the pipeline. Each RTU comprises of redundant power supplies and processors providing 100% availability of the system even under failure and severe environmental desert conditions.
-
Hits: 498
-
-
Storm water monitoring - Dubai Airporthot!
-
19.09.2006
-
See how Kingfisher RTUs ensure excess surface water does not close the airport (it does not rain often, but when rain comes, it is a flash storm). A SCADA system using a redundant data highway allows remote monitoring and control of storm water pumping stations, flow meters and storage chambers located around the airport
-
Hits: 1212
-
-
Enerco Gas Distributionhot!
-
19.09.2006
-
ENERCO Gas is New Zealand’s largest gas retailer, with gas network operations located in four separate regions. The RTUs must provide realtime information (using exception reporting) and use time tagged data to store up to 35 days of accumulated data, that includes 30 minute averages of pressure, temperature, volume and uncorrected volume.
-
Hits: 1117
-
-
Grand Canal - Flood Management Chinahot!
-
19.09.2006
-
Jiangsu Dept. of Water Conservancy, Nanjing, China. The project covers an area of 300km x 200km from Nanjing to Suqian in the northern part of the Jiangsu Province.
-
Hits: 1194
-
|
|